BOT15 yrs · 14–18%
Build-Operate-Transfer
Private partner builds, operates and transfers infrastructure back to the State at concession end.
Structured models for governments, telcos and infrastructure funds to co-deploy the Abraka Smart Transit stack — from electrified mobility to flood-resilient drainage.
| Code | Model | Term | Return | Indicative CapEx |
|---|---|---|---|---|
| BOT | Build-Operate-Transfer | 15 yrs | 14–18% | ₦8.0B |
| DBFO | Design-Build-Finance-Operate | 20 yrs | 12–16% | ₦12.5B |
| TELCO | Telco Co-Deployment | 10 yrs | Revenue share | ₦1.2B |
| JV | Joint Venture SPV | Open | Equity 30/70 | ₦4.0B |
Private partner builds, operates and transfers infrastructure back to the State at concession end.
Long-tenor model for drainage and solar corridors with availability payments.
MTN / Airtel / Glo deploy 5G small-cells on Smart Transit poles in exchange for site rights.
State and private SPV co-own the operating company — preferred for transit fleets.
| Lot | Programme | Value | Window | Status |
|---|---|---|---|---|
| LOT-A | Drainage Corridor I | ₦4.2B | Q3 2026 | OPEN |
| LOT-B | Solar Grid Phase 2 | ₦2.8B | Q4 2026 | OPEN |
| LOT-C | Keke Electrification | ₦1.6B | Q1 2027 | PREQUAL |
| LOT-D | Pole Telco Co-Lease | ₦0.9B | Rolling | OPEN |