TA: NORMAL
Investor Room // PPP

Partnership Frameworks

Structured models for governments, telcos and infrastructure funds to co-deploy the Abraka Smart Transit stack — from electrified mobility to flood-resilient drainage.

Pipeline
₦25.7B
A · Models

Concession & co-deployment structures

CodeModelTermReturnIndicative CapEx
BOTBuild-Operate-Transfer15 yrs14–18%₦8.0B
DBFODesign-Build-Finance-Operate20 yrs12–16%₦12.5B
TELCOTelco Co-Deployment10 yrsRevenue share₦1.2B
JVJoint Venture SPVOpenEquity 30/70₦4.0B
BOT15 yrs · 14–18%

Build-Operate-Transfer

Private partner builds, operates and transfers infrastructure back to the State at concession end.

DBFO20 yrs · 12–16%

Design-Build-Finance-Operate

Long-tenor model for drainage and solar corridors with availability payments.

TELCO10 yrs · Revenue share

Telco Co-Deployment

MTN / Airtel / Glo deploy 5G small-cells on Smart Transit poles in exchange for site rights.

JVOpen · Equity 30/70

Joint Venture SPV

State and private SPV co-own the operating company — preferred for transit fleets.

B · Pipeline

Open lots and pre-qualification windows

LotProgrammeValueWindowStatus
LOT-ADrainage Corridor I₦4.2BQ3 2026OPEN
LOT-BSolar Grid Phase 2₦2.8BQ4 2026OPEN
LOT-CKeke Electrification₦1.6BQ1 2027PREQUAL
LOT-DPole Telco Co-Lease₦0.9BRollingOPEN
Abraka Smart Transit · Investor RoomDelta State · Nigeria · 06.248°N / 005.783°E